Phase 4 Schematic Design
This phase of the project will focus on the facility's spatial layout, scale, and functional relationships. This work includes:
- Laying out the programming spaces and zoning within the footprint
- Exploring the circulation and flow of the facility
- Operational and technical requirements for the systems in the building
- Site integration and sustainability
- Safety and CPTED (Crime Prevention through Environmental Design)
Share Phase 4 Schematic Design on Facebook
Share Phase 4 Schematic Design on Twitter
Share Phase 4 Schematic Design on Linkedin
Email Phase 4 Schematic Design link