Public Participation Phase 3 Survey
Project Background
The Sturgeon Heights Reservoir and Pump Station, located at 37 Sunset Boulevard, is the main St. Albert reservoir which receives water from the City of Edmonton (EPCOR) supply line and works with the two other reservoirs in the community to distribute potable water to St. Albert residents, schools and businesses. As the oldest structure of its kind in St. Albert, it can no longer be upgraded and must be rebuilt to ensure the long-term reliable and safe distribution of potable water for the community and maintain fire protection.
To ensure water services in the City are not disrupted, the current reservoir and pump station must remain operational while a new reservoir and pump station is being built. This means the new structure must be located within Salisbury Park in order to take advantage of the current underground infrastructure, as well as to maintain water pressure and meet demand requirements. Once construction of the new reservoir and pump station is complete and operational, the current reservoir and pump station will be decommissioned, and restoration of the park will take place.
Please look through the information materials before you complete this survey, available at conversation.stalbert.ca
The presentation materials describe the overall project, timelines and the recommended concept. Your feedback about the Sturgeon Heights Reservoir and Pump Station Project is important and will be used as the project moves into design and construction.