Dorchester Park Playground Replacement

Share on Facebook Share on Twitter Share on Linkedin Email this link

add image description


October 1, 2021 update: The new playground is now open!

The City of St. Albert is redeveloping Dorchester Park playground in Deer Ridge along Giroux Road. Residents were invited to share feedback on the playground proposed design options through an online survey from April 28 - May 20, 2021. Feedback will help identify which play features are preferred and will be considered alongside:

  • Available budget
  • Sustainable maintenance requirements
  • Product availability
  • Project schedule
  • Contractor qualifications and experience

The scope of this program falls within the municipal repair, maintain, replace (RMR) capital plan. A guiding principle of this program is to replace "like for like" elements. Therefore, where possible the playground replacement design strives to include key play feature elements that are consistent with the original design.

We thank everyone who submitted their thoughts and ideas through the survey. Remember to click the subscribe button at the top right of this page to sign up for project updates.


October 1, 2021 update: The new playground is now open!

The City of St. Albert is redeveloping Dorchester Park playground in Deer Ridge along Giroux Road. Residents were invited to share feedback on the playground proposed design options through an online survey from April 28 - May 20, 2021. Feedback will help identify which play features are preferred and will be considered alongside:

  • Available budget
  • Sustainable maintenance requirements
  • Product availability
  • Project schedule
  • Contractor qualifications and experience

The scope of this program falls within the municipal repair, maintain, replace (RMR) capital plan. A guiding principle of this program is to replace "like for like" elements. Therefore, where possible the playground replacement design strives to include key play feature elements that are consistent with the original design.

We thank everyone who submitted their thoughts and ideas through the survey. Remember to click the subscribe button at the top right of this page to sign up for project updates.

Consultation has concluded
  • What We Heard Report & Final Playground Design

    Share on Facebook Share on Twitter Share on Linkedin Email this link
    supporting image

    Thank you to those who submitted their thoughts and ideas through the Dorchester Park Playground survey. The valuable feedback and information that the project team received was used to select the successful playground contractor, MPI Inc.. The final Dorchester Park playground design along with the results from the survey can be found in the What We Heard Report.

    Construction on the playground will begin in summer 2021.