October 1, 2021 update: The new playground is now open!
The City of St. Albert is redeveloping Dorchester Park playground in Deer Ridge along Giroux Road. Residents were invited to share feedback on the playground proposed design options through an online survey from April 28 - May 20, 2021.Feedback will help identify which play features are preferred and will be considered alongside:
Available budget
Sustainable maintenance requirements
Product availability
Project schedule
Contractor qualifications and experience
The scope of this program falls within the municipal repair, maintain, replace (RMR) capital plan. A guiding principle of this program is to replace "like for like" elements. Therefore, where possible the playground replacement design strives to include key play feature elements that are consistent with the original design.
We thank everyone who submitted their thoughts and ideas through the survey. Remember to click the subscribe button at the top right of this page to sign up for project updates.
October 1, 2021 update: The new playground is now open!
The City of St. Albert is redeveloping Dorchester Park playground in Deer Ridge along Giroux Road. Residents were invited to share feedback on the playground proposed design options through an online survey from April 28 - May 20, 2021.Feedback will help identify which play features are preferred and will be considered alongside:
Available budget
Sustainable maintenance requirements
Product availability
Project schedule
Contractor qualifications and experience
The scope of this program falls within the municipal repair, maintain, replace (RMR) capital plan. A guiding principle of this program is to replace "like for like" elements. Therefore, where possible the playground replacement design strives to include key play feature elements that are consistent with the original design.
We thank everyone who submitted their thoughts and ideas through the survey. Remember to click the subscribe button at the top right of this page to sign up for project updates.
CLOSED: Thank you to those who submitted their thoughts and ideas through the Dorchester Park Playground survey. We received 103 responses with valuable feedback and information that the project team will use to select the successful playground contractor and finalize the design for Dorchester Park Playground.
The City of St. Albert is currently updating Dorchester Park playground and values your feedback on some design choices. Your input will help determine the style and features of the playground.
Thank you and we hope you enjoy being involved!
About Dorchester Park Playground
Dorchester Park playground is classified as a community park with an existing playground structure that is designed for ages 18 months to 5 years. The playground lifecycle replacement program replaces “like for like”, and will include the replacement of wood curbing borders, sand safety surfacing, and park furniture amenities..
Note: There are two playground design options included in this survey. Please consider evaluating all playground designs as your feedback is very valuable on all of them.
Consultation has concluded
Share Dorchester Park Playground Replacement Survey on FacebookShare Dorchester Park Playground Replacement Survey on TwitterShare Dorchester Park Playground Replacement Survey on LinkedinEmail Dorchester Park Playground Replacement Survey link
Dorchester Park Playground Replacement has finished this stage
Site assessment review and final scope requirement details are confirmed and finalized.
Public Engagement
Dorchester Park Playground Replacement has finished this stage
Dorchester Playground Replacement project is ready to receive public input on desired play feature preferences pertaining to the playground design proposal options received through the public tender process.
Survey Feedback Evaluation
Dorchester Park Playground Replacement has finished this stage
Project team will evaluate feedback from the survey responses to help select the successful playground contractor and finalize the playground design.
Construction
Dorchester Park Playground Replacement has finished this stage
Site work construction includes the removal and replacement of existing playground equipment, curbing, safety surfacing, and park furniture amenities.
Park Opening and Operation
Dorchester Park Playground Replacement is currently at this stage
The park site is open to the public! Ongoing operations and maintenance is managed by the City.